Floor Panel Method

1. Delivery of LEIBEL lightweight floor panels

The floor panel will be marked by a code code according to the placement in the field, after that it is ready to be sent to the project location.

metode-pengiriman-1
metode-pengiriman-2
metode-pengiriman-3

2. Decrease the panel to the bottom of the truck and shunt to the installation location

After arriving at the location the panel will be lowered to the area stock at the project location and will be driven to the installation location. It would be better if the delivery truck can immediately stop just below the structure of the building that will be installed because it will be immediately lifted using a hoist / takel.

 

metode-penurunan-1 metode-penurunan-2

 

3. Lifting the panel to the top of the structure with a tack / hoist

The panel will be lifted to the top of the structure using the help of the turtle / hoist. After arriving at the top of the panel structure, it will immediately be placed in the position according to the working image.

 

metode-pengangkatan-1 metode-pengangkatan-2

 

4. Laying and setting of LEIBEL Floor Panels

After being placed on a steel or concrete beam, the panel will be shifted and set so that the placement is in accordance with the working drawing.

 

metode-peletakan-1 metode-peletakan-2 metode-peletakan-3

 

5. Installation of cleaning between panel joints and above structural beams

After the LEIBEL floor panel is fully installed, it will continue with the iron installation work between the floor panel joints and also the binder to the structural beam.

 

metode-pemasangan-1 metode-pemasangan-2

 

6. Cor connection between panels and above beams

After all the iron binders are installed, the final step is to do the casting along the area that has been installed. This casting process can be assisted with K-225 Instant Concrete material. We provide this product called BEPMIX K-225.

 

metode-cor-sambung-1 metode-cor-sambung-2 metode-cor-sambung-3 metode-cor-sambung-4

 

7. LEIBEL Light Floor Panels have been installed and can be installed directly on the ceramic

After the LEIBEL floor panel is fully installed, it will continue with the iron installation work between the floor panel joints and also the binder to the structural beam.

 

metode-hasil-pasang-1 metode-hasil-pasang-2